Brand New Power plant 210 MW

  • Type:

    Negotiated Sales

  • Location:

    Other

  • Manufacturer:

    N/A

  • PDF: pdf file
  • Contact Person:

    Eng. Shehta AlSahhar

  • Video: No video Uploaded
Description Main Equipment –Gas Turbines
•2 x GE PG6101FA Un-flared Gas Turbines (Dual Fuel –Gas & Distillate Oil)•Output 72 MWegross (Dry low Nox-DLN2)
•Speed 5200 rpm
•Firing Temperature –1280°C
•Exhaust Temperature –582°C
•Average Emissions -NOx23 mg/m3(60mg/m3) CO 16 mg/m3 (150mg/m3)
•2 x 11.5 kV Alstom generators (82 MVA) connected via Renkgearbox
•IED Industrial Emissions Directive –2016 (50mg/Nm3 NOxlimit) –fully compliant –no investment required.

Main Equipment –HRSG’s
•2 x Stork Dual Pressure Unfired Heat Recovery Steam Generators•Vertically slung / natural circulation / no supplementary firing
•No bypass facility installed (only start up vents and steam dumps)
•Fed via common dearator(Dearatedwith LP Steam)
•AVT Chemistry Control (Ammonia / Carbohydrazide/ TSP)
•3 x 100% HP feed water pumps (3.3KV)
•2 x 100 % LP feed water pumps (400V)
•HP Steam Pressure 107 bar @ 536°C
•LP Steam Pressure 9.6 bar @ 240°C

Gallery

Lot catalogue